RiggerSafe®
push pull tools
for Vietnam.
Fabricated components, offshore support and industrial maintenance.
Vung Tau / energy fabrication and supply bases
PTSC identifies its Vung Tau supply base as a logistics location for energy operations. Positioning fabricated parts and landing equipment are useful task families for a controlled RiggerSafe evaluation.
PTSC — supply-base operations ↗
Locations provide industry context, not endorsements, product approvals or PSC installation claims.
Observe hand contact during the last stage of component landing.
Choose the shortest workable reach that maintains the assessed separation.
Review surface engagement and release before standardising a tool.
Match the contact.
Plan the working distance.
Consider the direction of movement, load surface, pinch zones, available space and operator position. Select a length and contact insert through the task assessment. A longer tool is not automatically the better choice.



RiggerSafe guides loads supported by an approved lifting system. It must not lift, suspend, support, pry, lever or arrest load weight.
Download the selection guide ↓Specify the task.
Confirm the destination.
Use the consignee’s current address and project receiving instructions. Confirm freight terms and whether onward delivery is included.
Send configuration, quantity, destination and required date. Availability, dispatch, freight and commercial terms are confirmed with the quotation. Regional coverage does not imply local inventory.
Prepare an enquiry ↗Start with a representative trial.
Record why the hand enters the task. Check engagement, release, posture and communication within the approved lifting method. Review operator feedback and remaining exposure before standardising across sites.
Need a different control function?
Explore PSC taglines, retrievers, magnetic and manual-handling tools ↗